WP1: Conceptual Architecture
Leader: FZI
Id | Name | Type | Status |
---|---|---|---|
D1.1 | As-Is and To-Be analysis |
Report | Done |
D1.2 | Conceptual SYNERGY architecture | Report | Done |
WP2: Collaboration Knowledge Services
Leader: Coventry University
Id | Name | Type | Status |
---|---|---|---|
D2.1 | Collaboration Knowledge Services Framework |
Report | Done |
D2.2 | Collaboration Risk Assessment and Interpretation |
Report | Done |
D2.3 | Knowledge Acquisition from Collaborators |
Prototype Report |
Done |
WP3: Collaboration Moderator Services
Leader: Loughborough University
Id | Name | Type | Status |
---|---|---|---|
D3.1 | Knowledge modelling requirements for Collaboration Moderator |
Report | Done |
D3.2 | Specification of a Collaboration Moderator |
Report | Done |
D3.3 | Report on design and implementation of a prototype Collaboration Moderator |
Report |
Done |
WP4: Collaboration Patterns
Leader: ICCS
Id | Name | Type | Status | ||
---|---|---|---|---|---|
D4.1 | Collaboration Patterns model and ontology | Report | Done | ||
D4.2 | Collaboration Patterns Editor and Simulator |
Prototype | Done | ||
D4.3 | Collaboration Patterns Assistant |
Prototype |
Done |
WP5: Knowledge Formalisation
Leader: [FZI|]
Id | Name | Type | Status |
---|---|---|---|
D5.1 | State of the art in ontology, metadeta and rule-based management |
Report | Done |
D5.2 | First iteration prototype of knowledge formalisation framework | Prototype | Done |
D5.3 | Secold iteration prototype of knowledge formalisation framework | Prototype |
Done |
WP6: Evolution Services
Leader: [FZI|]
Id | Name | Type | Status |
---|---|---|---|
D6.1 | Report describing state of the art in knowledge evolution and requirement specification |
Report | Done |
D6.2 | First iteration prototype of evolution framework | Prototype | Done |
D6.3 | Second iteration prototype of evolution framework | Prototype |
Done |
WP7: Integration & refinement
Leader: CIM
Id | Name | Type | Status |
---|---|---|---|
D7.1 | Conceptual architecture of SYNERGY integrated system |
Report | Done |
D7.2 | Integrated SYNERGY system & system manual |
Prototype | Done |
D7.3 | Evaluated SYNERGY system |
Report |
Ongoing |
D7.4 |
Quality assurance of SYNERGY system | Report |
N/A |
WP8: Pilot Development, Implementation and Evaluation
Leader: Douglas Connect
Id | Name | Type | Status |
---|---|---|---|
D8.1 | Collaboration use-cases for testing & validation |
Internal Report | Done |
D8.2 | Piloting study specifications | Internal Report | Done |
D8.3 | Feedback report on application of SYNERGY tools to Pilod studies |
|
Ongoing |
D8.4 |
Final evaluation of pilot development and implementation |
|
N/A |
WP9: Methodology for Knowledge-based Collaboration Services
Leader: ICCS
Id | Name | Type | Status |
---|---|---|---|
D9.1 | SYNERGY methodology for knowledge-based collaboration services |
Report |
Done |
WP10: Dissemination & Exploitation
Leader: Petals Link
Id | Name | Type | Status |
---|---|---|---|
D10.1 | SYNERGY standardization contributions |
Report | Done |
D10.2 | SYNERGY scientific and business publications |
Report | Done |
D10.3 | SYNERGY open-source software packages and documentation |
Prototype Report |
Done |
D10.4 |
SYNERGY web site |
web site |
Done |
D10.5 |
SYNERGY detailed exploitation plan |
Report |
Done |
D10.6 |
Contributions to cluster and concertation activities |
N/A |
WP11: Project Management
Leader: Coventry University
Id | Name | Type | Status |
---|---|---|---|
D11.1 | Project handbook |
Report | Done |
D11.2 | External liaison reports |
Report | Done |
D11.3 | EC progress reports |
Report |
Done |
D11.4 |
EC management reports, including report on progress |
Report |
Done |
D11.5 |
EC final report |
Report |
N/A |
D11.6 |
Report on horizontal issues |
Report |
N/A |